This assessment provides a planning-level view of your project based on the information you submitted.
It is designed to help you evaluate readiness before committing time or design resources.
This is not a quotation.
Assement Complete
This assessment provides a planning-level view of your project based on the information you submitted.
It is designed to help you evaluate readiness before committing time or design resources.
This is not a quotation.
Here is a summary of the information you provided.
Project Type
Lot Area
Finish Level Selected
With Buffer Fund
Project Use
Target Gross Floor Area
Target Budget
Project Fund
Location
No. of storey
Target Timeline
Project Type
Lot Area
Finish Level Selected
With Buffer Fund
Project Use
Target Gross Floor Area
Target Budget
Project Fund
Location
No. of storey
Target Timeline
This summary ensures we are working from the same information before any recommendation is made.
Based on your answers, your project is currently assessed as:
Based on your answers,
your project is currently assessed as:
Budget
Timeline
Finish Level
Buffer Fund
Desired Floor Level
Funding Source
This is a decision checkpoint, not a construction quote.
This is a decision checkpoint, not a construction quote.
Based on your inputs and selected finish level, your initial probable construction cost is:
Based on your inputs and selected finish level, your initial probable construction cost is:
This number is generated from your finish selection and target floor area.
This figure reflects early planning assumptions.
IIt is intended to support readiness decisions, not finalize pricing.
This number can change after plans and site conditions are confirmed.
This number is generated from your finish selection and target floor area.
This figure reflects early planning assumptions.
IIt is intended to support readiness decisions, not finalize pricing.
This number can change after plans and site conditions are confirmed.
The estimate above uses the following planning benchmarks:
Bare Finish
₱27,000 / sqm
Standard Finish
₱37,000 / sqm
High-end Finish
₱45,000 / sqm
Actual construction costs vary based on:
Actual construction costs vary based on:
What the Construction Cost Does NOT Include
Architectural and engineering professional fees
Interior design services and fit-out works
Building permit and government fees
Surveying and lot verification
Soil boring and geotechnical testing
Fencing and perimeter works
Landscaping and external works
Acoustic design or specialist consultants
Utility connections and authority charges
These are separate project costs and should be planned alongside construction.
Planning-Level Reference Only
Responsible property owners typically plan for the following separate costs:
Professional Fees
Architectural only: ~ 6% of construction cost
Architectural + Engineering: ~ 10% of construction cost (recommended for houses)
Interior Design: ~ 15% of interior fit-out cost
Other Common Costs
Soil boring / geotechnical test: ~1–3%
Surveying: ~0.5–1%
Building permits & government fees: ~1–2%
Fencing & gates: ~1–3%
Landscaping & external works: ~3–8%
Utility connections: varies by location
Specialist consultants: project-specific
These ranges are shown to support responsible planning, not final costing.
Responsible property owners typically plan for the following separate costs:
Professional Fees
Architectural only: ~ 6% of construction cost
Architectural + Engineering: ~ 10% of construction cost (recommended for houses)
Interior Design: ~ 15% of interior fit-out cost
Other Common Costs
Soil boring / geotechnical test: ~1–3%
Surveying: ~0.5–1%
Building permits & government fees: ~1–2%
Fencing & gates: ~1–3%
Landscaping & external works: ~3–8%
Utility connections: varies by location
Specialist consultants: project-specific
These ranges are shown to support responsible planning, not final costing.
Our Professional Recommendation
Based on your answers, your project is currently assessed as:
Our Professional Recommendation
Based on your answers, your project is currently assessed as:
The next step is to book a Clarity Call.
The Clarity Call is a 45-min assessment session to:
validate these results
review scope, values, and decision readiness
confirm whether the project should move forward
The next step is to
book a Clarity Call.
The Clarity Call is a 45-min assessment session to:
validate these results
review scope, values, and decision readiness
confirm whether the project should
move forward
This Build Cost Readiness Check helps answer one question:
Is it responsible to move forward with this project right now?
Clarity now costs less than millions worth of
correction later.
This Build Cost Readiness Check helps answer one question:
Is it responsible to move forward with this project right now?
Clarity now costs less than millions worth of correction later.