This assessment provides a planning-level view of your project based on the information you submitted.
It is designed to help you evaluate readiness before committing time or design resources.

This is not a quotation.

Assement Complete

Your Build Cost Readiness
Report is Ready

This assessment provides a planning-level view of your project based on the information you submitted.
It is designed to help you evaluate readiness before committing time or design resources.

This is not a quotation.

I.

PROJECT SUMMARY

Here is a summary of the information you provided.

Project Type

Lot Area

Finish Level Selected

With Buffer Fund

Project Use

Target Gross Floor Area

Target Budget

Project Fund

Location

No. of storey

Target Timeline

Project Type

Lot Area

Finish Level Selected

With Buffer Fund

Project Use

Target Gross Floor Area

Target Budget

Project Fund

Location

No. of storey

Target Timeline

This summary ensures we are working from the same information before any recommendation is made.

II.

YOUR BUILD COST READINESS RESULT

Based on your answers, your project is currently assessed as:

Based on your answers,

your project is currently assessed as:

III.

WHAT YOUR ANSWERS

TELL US

III.

WHAT YOUR ANSWERS TELL US

  • Budget

  • Timeline

  • Finish Level

  • Buffer Fund

  • Desired Floor Level

  • Funding Source

This is a decision checkpoint, not a construction quote.

This is a decision checkpoint, not a construction quote.

IV.

INITIAL CONSTRUCTION COST

Based on your inputs and selected finish level, your initial probable construction cost is:

IV.

INITIAL

CONSTRUCTION

COST

Based on your inputs and selected finish level, your initial probable construction cost is:

This number is generated from your finish selection and target floor area.

This figure reflects early planning assumptions.
IIt is intended to support readiness decisions, not finalize pricing.
This number can change after plans and site conditions are confirmed.

This number is generated from your finish selection and target floor area.

This figure reflects early planning assumptions.
IIt is intended to support readiness decisions, not finalize pricing.
This number can change after plans and site conditions are confirmed.

V.

COST BASIS USED

The estimate above uses the following planning benchmarks:

Bare Finish

₱27,000 / sqm

Standard Finish

₱37,000 / sqm

High-end Finish

₱45,000 / sqm

Actual construction costs vary based on:

Actual construction costs vary based on:

design complexity

site conditions

material availability

construction methodology

VI.

IMPORTANT COST CLARIFICATIONS

What the Construction Cost Does NOT Include

  • Architectural and engineering professional fees

  • Interior design services and fit-out works

  • Building permit and government fees

  • Surveying and lot verification

  • Soil boring and geotechnical testing

  • Fencing and perimeter works

  • Landscaping and external works

  • Acoustic design or specialist consultants

  • Utility connections and authority charges

These are separate project costs and should be planned alongside construction.

VII.

TYPICAL ADDITIONAL PROJECT COSTS

Planning-Level Reference Only

Responsible property owners typically plan for the following separate costs:

Professional Fees

Architectural only: ~ 6% of construction cost

Architectural + Engineering: ~ 10% of construction cost (recommended for houses)

Interior Design: ~ 15% of interior fit-out cost

Other Common Costs

Soil boring / geotechnical test: ~1–3%

Surveying: ~0.5–1%

Building permits & government fees: ~1–2%

Fencing & gates: ~1–3%

Landscaping & external works: ~3–8%

Utility connections: varies by location

Specialist consultants: project-specific

These ranges are shown to support responsible planning, not final costing.

Responsible property owners typically plan for the following separate costs:

Professional Fees

Architectural only: ~ 6% of construction cost

Architectural + Engineering: ~ 10% of construction cost (recommended for houses)

Interior Design: ~ 15% of interior fit-out cost

Other Common Costs

Soil boring / geotechnical test: ~1–3%

Surveying: ~0.5–1%

Building permits & government fees: ~1–2%

Fencing & gates: ~1–3%

Landscaping & external works: ~3–8%

Utility connections: varies by location

Specialist consultants: project-specific

These ranges are shown to support responsible planning, not final costing.

VIII.

BUILD COST READINESS

RECOMMENDATION

Our Professional Recommendation

Based on your answers, your project is currently assessed as:

Our Professional Recommendation

Based on your answers, your project is currently assessed as:

IX.

NEXT STEP

The next step is to book a Clarity Call.

The Clarity Call is a 45-min assessment session to:

validate these results

review scope, values, and decision readiness

confirm whether the project should move forward

The next step is to

book a Clarity Call.

The Clarity Call is a 45-min assessment session to:

validate these results

review scope, values, and decision readiness

confirm whether the project should

move forward

X.

FINAL NOTE

This Build Cost Readiness Check helps answer one question:

Is it responsible to move forward with this project right now?

Clarity now costs less than millions worth of

correction later.

This Build Cost Readiness Check helps answer one question:

Is it responsible to move forward with this project right now?

Clarity now costs less than millions worth of correction later.